Scaldiaharbour Phase 2 Scaldiaharbour phase 2 is the continuation of Scaldiaharbour phase 1 consisting of a 600 m long quay, with a depth of 17.00 m below N.A.P. Phase 1 was executed in 1977 and 1998.
Preceding phase 1 the existing high water protection dike has been diverted.
Phase 2 consists of:
Quays
Car handling area inland shipping approximately 64 m with retaining height.
Quay North approximately 880 m with a retaining height of 23.50 m.
Head Quay appr. 250 m with a retaining height of 17 m.
Quay South appr. 510 m with a retaining height of 23.50 m.
Dreding and coastal works
Dredging and reclamation / removal of sediment appr. 2.400.000 m3.
Various underwater slope and bottom protections.
Quay North and Head quay are mainly intended for container transhipment by Sea-Invest/Zuidnatie. Quay South is mainly intended for cargo transhipment by Ver-brugge Terminals.
Activities:
- Feasibility study
- Preliminary design
- Detailed design
- Design, specification and tendering
- Supervision during construction (ongoing)
|